Infrastructure & highways

Understand the ground. Connect the route.

Corridor, alignment and level surveys that give infrastructure teams a consistent base for planning, design and construction.

A scope built around your site

Measure what matters
to the next stage.

We support survey projects across India, planning the method, mobilisation and deliverables around your site and the decisions your team needs to make.

01

Corridor mapping

Record ground conditions and visible features across the agreed road, railway or infrastructure corridor.

02

Profiles and cross-sections

Capture levels at the required intervals and locations so engineers can assess terrain and develop alignment options.

03

Control and setting-out

Establish agreed survey references and set out design points for construction teams, with the coordinate and height systems made clear.

04

Structures and interfaces

Survey the agreed bridge approaches, junctions, drainage features and connections where the new works meet existing assets.

What to share

A useful first brief

  • Proposed alignment, chainage limits and corridor width.
  • Client specifications and the engineer’s output requirements.
  • Existing control points, drawings and benchmarks.
  • Access permissions, traffic restrictions and work programme.
Read the survey preparation guide

Outputs to agree

Information your team can use

  • Corridor survey drawings and feature information.
  • Longitudinal profiles and cross-sections as specified.
  • Control-point and benchmark schedules.
  • Setting-out or as-built records for the agreed works.

Formats, tolerances and acceptance criteria should come from the project specification and appointing authority; they are agreed before mobilisation.

From brief to handover

A clear process.

01 / Define the scope

Review the location, intended use, available records and the information your technical team requires.

02 / Survey and check

Plan the control and field observations around access, site conditions and the agreed measurement requirements.

03 / Coordinate the handover

Issue the agreed outputs with clear references, units, revisions and limitations, ready for your team to review.